9.26.2013

MIRAMAR PROJECT

Concrete crews install epoxy coated rebar in preparation for the structural slab. Successful coordination, planning, and strategic measures are especially important when working with limited space and close proximity to harsher elements.  



Project Team:
Construction by LUA, Inc. (Leonard Jr. and Tony Ochoa)
Architecture by AB Design Studio, Inc.
Interior Design by Winick Architects
Structural Engineer Taylor & Syfan

No comments:

Post a Comment